Locate here

SITE SPECIFICATIONS

OVERVIEW

City Muskogee, OK
County Muskogee County, OK
Ownership Publicly Owned by
Muskogee Municipal Authority
Total Acreage 642 acres
Available Tract Range 10 to 330 acres
Lease Rate $3,500/acre/year
Zoning I-1 - Light Industrial
FTZ Muskogee-Davis Field Airport can be added to Foreign Trade Zone 164

TRANSPORTATION

Interstate Access Muskogee Turnpike: 7 mi
US I-40: 15 mi
US I-44: 47 mi
Highway Access US 64: Frontage
US 69: 4 mi
US 62: 7 mi
Port Access Port Muskogee: 11 Miles
Airport Facilities Runway 13/31: 7200 x 150ft
Runway 04/22: 4498 x 75ft
Runway 18/36: 1904 x 60ft
Terminal: 5,000 sq. ft.

UTILITIES

Electric OG&E has a 12.47 kV electric distribution lines along Sabre St with 2.5-3.5 MW of available capacity.
Natural Gas ONG has a 12” line around the south and east side with a 2” line providing service to the built areas of the airport. A 6” line travels along Gurlick Street. This presents a well-placed utility for end-users
Water City of Muskogee has a 12” water line serving the airfield-built areas. A 100,000-gallon water tower is onsite providing pressure to existing system. Fireplug-type hydrants throughout the airport property are mapped
Wastewater City of Muskogee has a 4” gravity sewer line extending to a lift station serving the built areas of the airfield
Fiber AT&T Fiber

SERVICES & SUPPORT

Training Support Indian Capital Technology Center: 11 mi
Emergency Response EMS: 4.6 mi
Fire (ISO 2): 4.1 mi
Police: 6.1 mi

DUE DILIGENCE

Suitable for development with no major impediments. Comprehensive Site Diligence and Master Plan (2020)

Site Readiness Roadmap

2017

Runway 04–22 Improvements

Asphalt overlay and joint repair completed

2017

FAA AIP Funding Secured

Received FAA Airport Improvement Program funds

2018

Taxiway & Apron Improvements

Taxiway Bravo and primary apron joint repair and resealing

2018

Runway 13–31 Rehabilitation

Rehabilitated; joint reseal and GSB-88 surfacing

2018

OAC Funding Secured

Received Oklahoma Aeronautics Commission funds

2018

Parking Expansion

Parking added east of the FBO building T-160

2018

EV Charging Installed

Tesla destination chargers installed

2019

Jet Hardstand Added

Premium parking for corporate customers

2020

Environmental Survey Completed

ESA Phase 1 assessment

2021

Site Due Diligence

Comprehensive site due diligence completed

2022

Height & Zoning Map

Height and zoning map completed

Nov 2023

Readiness Assessment

Airport Road Construction

Roadmap

Airport Road Construction

Roadmap

Airport Focus Area Mapping

Industrial, aviation, and related uses

Roadmap

Geotech Investigation

Western Tract

Muskogee
Labor Shed

30 Minute
Drive
45 Minute
Drive
60 Minute
Drive
TOTAL POPULATION174,247554,1181,240,379
LABOR FORCE73,798258,633595,788
BACHELOR'S DEGREE20.3%23.9%26.5%

LEARN MORE ABOUT
MUSKOGEE-DAVIS FIELD AIRPORT

Discover why Muskogee offers an ideal business environment for companies looking to reduce operating costs, reach global markets and access skilled talent.